1 |
Land use planning and its impact on movement pattern in Purbalingga City |
P Hardini, EW Indriyati, G Hidayanti |
2023 |
2 |
Road Infrastructure Deficiency and Road Safety Audit at Black Spot Area in Rural Road |
G Sugiyanto, R Suciningtyas, EW Indriyati, B Mulyono, MY Santi |
2022 |
3 |
Determining the maximum speed limit based on stopping sight distance (SSD) and risk of fatality |
G Sugiyanto, F Wirawan, EW Indriyati, Y Yanto, MY Santi |
2022 |
4 |
Determining of black spot location in Purbalingga Regency using road geometric approach |
G Sugiyanto, YA Prasetyo, EW Indriyati, Y Yanto, MY Santi |
2021 |
5 |
Determining the Maximum Speed Limit in Residential Area |
G Sugiyanto, F Wirawan, EW Indriyati, Yanto, MY Santi |
2021 |
6 |
Road safety audit at black spot area: Case study in Tlahab Lor, Karangreja, Purbalingga |
G Sugiyanto, A Fadli, R Suciningtyas, EW Indriyati, MY Santi |
2019 |
7 |
Penentuan Lokasi Rawan Kecelakaan Lalu Lintas dengan Pendekatan Fasilitas Perlengkapan Jalan di Kabupaten Purbalingga |
AD Ermawati, G Sugiyanto, EW Indriyati |
2019 |
8 |
Lembar penilaian peer review dan cek similarity dengan Turnitin untuk artikel berjudul" Road safety audit at black spot area (case study in Tlahab Lor, Karangreja, Purbalingga … |
G Sugiyanto, A Fadli, R Suciningtyas, EW Indriyati, MY Santi |
2019 |
9 |
Lembar Penilaian Peer review dan cek similarity dengan Turnitin untuk artikel berjudul" The impact of lowering speed limit on mobility and the environment" |
G Sugiyanto, A Fadli, MY Santi |
2019 |
10 |
Lembar penilaian peer review dan cek similarity dengan Turnitin untuk artikel berjudul" Road safety audit at black spot area (case study in Tlahab Lor, Karangreja, Purbalingga … |
G Sugiyanto, A Fadli, R Suciningtyas, EW Indriyati, MY Santi |
2019 |
11 |
Karakteristik kecelakaan lalu lintas dan analisis lokasi black spot di Kabupaten Bogor |
L Astarina, G Sugiyanto, EW Indriyati |
2018 |
12 |
ANALISIS INDEKS PENETRASI ASPAL DENGAN PENAMBAHAN ASBUTON MURNI |
EW Indriyati |
2018 |
13 |
Pengendalian Banjir Pada Wilayah Padat Penduduk Tanpa Kelayakan Saluran Drainase Dengan Sumur Resapan Pada Badan Jalan |
A Maryoto, SN Purnomo, EW Indriyati |
2017 |
14 |
Kajian Perbandingan Penggunaan Aspal Modifikasi AsButon Dan Asphalt Rubber (AR) Untuk Infrastruktur Jalan |
EW Indriyati |
2017 |
15 |
Pengaruh asbuton murni terhadap indeks penetrasi aspal |
EW Indriyati |
2017 |
16 |
Evaluasi Penerapan Zona Selamat Sekolah Di Sekolah Dasar |
G Sugiyanto, MD RPH, MY Santi, EW Indriyati |
2016 |
17 |
Efektivitas Zona Selamat Sekolah (ZoSS) di Sekolah Dasar (Studi Kasus di Kabupaten Banyumas, Provinsi Jawa Tengah) |
G Sugiyanto, EW Indriyati, MY Santi, MZ Tanjung |
2015 |
18 |
Perbaikan Sifat Reologi Aspal Dengan Penambahan Asbuton Murni Dalam Tinjauan Modulus Kekakuan dan Kriteria Kerusakan Perkerasan |
EW Indriyati, BS Subagio, H Rahman |
2015 |
19 |
Kajian perbandingan perbaikan sifat reologi pada aspal modifikasi asbuton dan aspal modifikasi serbuk ban bekas |
EW Indriyati, KA Palupi |
2015 |
20 |
Evaluation of Fully Extracted ASBU-TON Proportion in the Petroleum Asphalt Mixes Within the Frame of Viscoelastic Behavior |
H Rahman, BS Subagio, EW Indriyati |
2015 |
21 |
Perbaikan Sifat Reologi Visco-Elastic Aspal dengan Penambahan Asbuton Murni Menggunakan Parameter Complex Shear Modulus |
EW Indriyati, BS Subagio, H Rahman |
2013 |
22 |
Kajian Perbaikan Sifat Reologi Visco-Elastic Aspal dengan Penambahan Asbuton Murni Menggunakan Parameter Complex Shear Modulus |
EW Indriyati, BS Subagio, H Rahman, SS Wibowo |
2012 |
23 |
Optimasi Berat Struktur Rangka Batang Pada Jembatan Baja Terhadap Variasi Bentang |
EW Indriyati |
2008 |
24 |
Evaluation of Fully Extracted ASBUTON Proportion in the Petroleum Asphalt Mixes Within the Frame of Viscoelastic Behavior |
H RAHMAN, BS SUBAGIO, EW INDRIYATI |
Tahun Belum Diisi |