Detail Artikel Scopus

Integrated vendor-buyer inventory model considering imperfect quality and inspection errors with controllable lead time

Penulis: Sofiana A.

Jurnal: IEEE International Conference on Industrial Engineering and Engineering Management

Tanggal Terbit: 2 July 2017

Volume: 2017-December

Halaman: 1321-1325

DOI: 10.1109/IEEM.2017.8290107

ISSN: 21573611

Jumlah Sitasi: 2

Tipe Agregasi: Conference Proceedin

Kuartil: